140 Reviews From Our Community
Rating for Feedback for STEEL BILLET Q235 OR ST-37 and STEEL SLAB
04-08-2020
-
Helpful? Yes (1)
- Comment
- Thanks (1)
JS NEOPLANT CO., LTD Headquarters
Company Information
we are a specialist Engineering�,Advanced Technology��and Project Financing Progam�up 70% to 100% each mega project�in term of collateral Security�on SPA,TUEK,EPC,EPC&F,BOT,BOOT,PPP,BOOMT,BOO,BLT,BET Base contract as hereunder.1. Engineering & Techmology� Consulting Service.
a. Surveying , Propecting and Exploring off-site each project.
b. Bird eye Design
c. Design and Drawing
d. Manufacturering
e.Transportating
f. Ground Breaking
g.Installing and Erecting
h.Commissioning and Test-Running
i. Traing and Turk-key
j. Warranty Service.
2.�Project�Financing Program.
a; Project�Financing or Loan Sum USD1M--USD500B
b. Project� Financing� Period for 5 years---30 years.
c. Interest Rate :LIBOR+1%--5% in Spread with CPI Indexation.
d. Moratorium for 1 years --10 years.
e. Reimbursement for 4 years--25 years.
3.�Negotiable Collateral or Fiancial Facility.
a.Sovereign Guarantee or Sovereign Bond
b. Bank Instrument
c. Partial Risk Guarantee。
d,SKR,CSKR,Historical Bond.
e.Crude Oil Contract or Energy Payment Guarantee
f.Cashes Equity
g. Mine Concession Ownership or Under Group Assets
h.IBOE,Gold Coin,Bank Check,Bank Note.
i.Buyers' Credit, Bonds
j.Other Kind of Collateral Security is nogotable
4.Electricity Power Plant
a. Solar Farm 0.5MW---5000MW
b. Windmill Farm 1MW--10.000MW
c. Hydro Power Dam�3MW---5000MW
d.Biomass Power Plant 5MW--200MW
e.HRSG Power Pant 5MW---100MW
f. Disel Power Plant 1MW----1000MW
g.Combined Cyle Power Plant�:�30MW---3000MW
h.Single Cycle Power� Plant 5MW---200MW
i. Coal Power Plant 50MW---10,000MW
j. MSW�Power Plant ;5MW---200MW
k.Geothermal Power Plant :5MW--500MW
5.Re.Cement Plant� and Calsning Plant
a.Grey Cment Plant Capacity 500TPD, 1000TPD,2500TPD.3000TPD.,5000TPD,10000TPD.
b. White Cement Plant Capacity 50TPD,100TPD,200TPD,300TPD,500TPD.1000TPD,
c.Calcium Carbonate Plant�50TPD---2000TPD.
d.Gypsum Powder Plant 100TPD--2000TPD.
e. Glass Fiber plant 5000TPY----20,000TPY
f. Rock Wool Plant 5000TPY---20,000TPY.
6.Steel Mill Plant.
a.Blast Furnace ;100TPD---30,000TPD.
b.Sponge Steel Mill:100TPD---2000TPD.
c. Billet Mill :500TPD----10,000TPD.
d.Hot Roll Mill:500TPD---10,000TPD.
e.Cols Roll Mill:50TPD---1000TPD.
f. Nickle Plating Mill:50TPD--500TPD.
g.Color Coating Mill 30TPD--200TPD
h. Steel Bar Mill�50,000TPY---2MTPY
i.� Steel Wire Mill 50,00TPY---1MTPYk.
k. Steel Casting Mill� 10,000TPY--50,000TPY.
l.� H/I Beam Mfg Plant 20,000TPY--1MTPY.
m. Steel Strip Plant 100,000TYP--1MTPY.
n.� Steel Rail Mfg Plant 100,000TPY--1MTPY
o, Bed Sleeper Plant 200,000PPY--1MPPY.
p. Steel Wire Rope Mill 50,000TPY---1MTPY
q. ARC� CO2 Welding Bar Plant 3000TPY--50,000TPY.
Size Negotiable.Capacity is negotiable.
7.Steel Pipe Mill Plant.
a. UOE Pipe Plant OD 610mm--OD1620mm
b. LSAW Pipe Plant OD 610mm--OD1620mm
c. SSAW Pipe Plant OD 508mm---OD3520mm
d. ERW Pipe Plant OD 25.4mm---OD610mm
e.SMLE Pipe Plant OD 25.4mm--OD1020mm
f.�Tube and Casing�Plant OD 45mm---OD610mm
g.Drilling Pipe Plant OD25.4mm---OD203.2mm
h. SST Pipe Plant OD12.5mm---OD2520mm
i.DIP pipe plant OD254mm---OD 2520mm
j.Capacity�can be negotiable between�Our Party and Investor from�10,000TPY---1M TPY each plant
8.Re.Refinery Plant.
a.Mini Refinery: 100BPD,200BPD,300BPD,500BD
b.Skd�Mounted Refinery: 1000BPD,2000BPD,5000BPD,10000BPD
c.Modular Type;5000BPD--50,000BPD
d.Coventional Refinery.20,000BPD,50,000BPD,100,000BPD,
200,000BPD,500,000BPD,,1MBPD.
9.Petro-Chemical Plant.
a. LNG Cracking Plant
b. LDPE ,LLDPE,HDPE Plant�20,000TYP--1MTPY.
c. PP, Plant� 10,000TPY---1MTPY.
d.HIPS,GPPS Plant 10,000TPY--500,00TPY
e.�PET Plant��5000TPY---200,000TPY
f.�PVC Plant 10,000TPY---1MTPY..
g.ABS,SAN Plant 10,000TPY---200,000TPY.
h,EVA Plant 20,000TPY--500,000TPY
i.Ammonia & Urea Plant 200TPD--5000RPD.
j.Nitric Acid Plant 50TPD---1000TPD.
k. Pulp and Paper Mill Plant 5000TPY---1MTPY
l. DCP� AC Foaming Agent Plant
m.LDPE Foam Plant
10.�Sugar Mill Plant and Food Plant
a. Suagr Mill for�Beet and Sugat Cane.500TPD-,20,000TPD.
b.�Instant noodle Plant 100,000PPD--1M PPD
c. Noodle Mill Plant
d. Floor Mill Plant 50TPD---10,000TPD
e. Casaba Mill Plant 30TPD---500TPD
f.� Eligble Oil Plant 20TPD---5000TPD.
g. Rice Mill Plant 10TPD----3000TPD.
h. Milk Powder Mill Plant
i.� Mineral Water Plant 500/Hr---30,000/Hr.
j. Fruit Juice Filling Plant
k. Milk and Yakurt Plant
m. Beer Filling Plant
n. Special Drinable Beverage� Plant
o. Bread and Cake Plant
q. Tomato Kechup Plant
r.� Furit and Fish Can MFG�Plant
s. Food Packing Plant
11.Rubber Tire Plant
a.�Radial Tire Plant ;1MPPY---10MPPY
b.Tire Remould Plant:20,000PPY--500,000PPY.
c. Tire Recycling Plant 100,000PPY--1MPPY
d. EPDM Foam Plant for Pipe and Sheet.
e. Rubber Globe� MFG Plant
f. Condome Making Plant
g. Nipple Making Plant
h. Rubber Boot Making Plant
12.Oil & Gas Drilling Rig Plant.
a.On Shore Drilling Plant 100M--10,000M
b.Off Shore Drilling Plant 300M--10,000M
c. Oil & Gas Pipe Line Project OD406mm---OD1620mm
d. Oil & Gas Stroage Tank Project
e. Crude Oil, LNG Tanker 3000DWT--450,000DWT
13.Metal Fabricating Plant.
a. AL-Foil Plant 5000TPY--20,000TPY
b. Copper Pipe Plant 5000TPY---100,000TPY.
c. Al-Wheeler Plant 1MPPY--10MPPY
d. Metal Casting Plant
e. Metal Coating Plant.
f.� Metal Ingot Plant.
g. Metal Refinery Plant.
h. Metal Wire� MFG Plant
I.� Metal Wire Drawing Plant
j. Metal Soldering Plant
14. Infrastructure Projects.
a. Railway Project
b.Subway Project
c.City Metro Project.
d. Mono-Rail Project.
e. Air Port project
f.� Deep Sea Port Project.
g. Water Transmission Pipe Line Project OD254mm---3520mm
h. Swege Water Drain Pipe Line Project OD254mm---4500mm
i.� Swege Water Treatment Plant
j.� High Way Project.
k. Expressway project.
l. Appropriated Wharf for Coal , Metal Ore.
15.Telecommunication Project.
a. Mobile Project.
b. Telephone Project
c.� Radio Broad Casting Station
d. TV Board Casring Station
e. Cable TV Board Casting Station
f.� Wi Fi Roll Out Project.
g. Air Port Radar Station
h. Wireless Repeater Tower
i. GPS System
16.Building and Housing Project.
a. Education School Project.
b. Hospital Project.
c. Single Stand Villa Project.
d.�Sport Stadium Project.
e. Apartment Project.
f.� Hotel Project.
g. Resort Project.
h. Commercail Building Project.
i. Affordable Housing Project.
j. Golf Field Project 18 Holes---72 Holes.
k. Civil Work Project.
l. Pre-Fab Housing Project.
m.Steel Structure Project,
n. Cold and Cooling Whare House project.
o. Slaughter Housing Project.
p. Agti-Green Housing Project.
17. Assembling Line Plant.
a. Electronic �Home Appliance� Products Assemble Line Plant
b. Car Assemmble Line Plant
c.� Air-Conditioner Assembling Plant
d.� TV ,Laptop Assembling Line Plant
e. Motor Cycle Assembling Line plant
f. Ship Building Plant
g. Air Plane Assembling Plant
h. Tractor Assembling Plant
i.� Diesel Generator Assembling Plant
j.� Bi Cycling Assembling Plant
k. Solar Panel Assembling Plant
l.� Windmill Trubine Assembling Plant
m.�Gas or Steam�Boiler Assembling Plant
o.� Electricity Fan Assembling Plant
p. Computer Assembling Plant
18. Other Plants and Project.
a. Textile Water Zet Mill Plant
b.��Flexso Graphic Printer,
c. Corregate Carton Box Making Plant
d. Suking Straw�Plant
e. Stripe�Making Plant
f.� Paper Shopping Bag Plant
g. Craft Paper Bag�Plant for Rice, Cement, Other,
h. Beauty Soap MFG Plant
i.� Leather Fabricating Plant
j.��Sport Shoes MFG� Plant.
k. Medical Facility.
l. Housing Project
j.�Hospital Project.
k. School Project.
Best Regards
JS NEOPLANT CO.,LTD� IN�HK
�